A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

Long- and medium-term production planning are tools to match production orders with resource capacity and that can also be used as a baseline for material procurement. The lack of a detailed schedule for the manufacturing operations, however, may cause difficulties in providing a proper material requirements planning and may affect the feasibility of the production plan itself. This paper proposes an approach, based on production process knowledge, to extract scheduling information from an aggregate production plan in order to support material procurement. The proposed approach is applied to an industrial case involving machining center production.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Axsater S. (1981) Aggregation of product data for hierarchical production planning. Operations Research 29(4): 744–756

    Article  Google Scholar 

  • Axsater S. (1986) On the feasibility of aggregate production plans. Operations Research 34(5): 796–800

    Article  Google Scholar 

  • Axster S., Jonsson H. (1984) Aggregation and disaggregation in hierarchical production planning. European Journal of Operational Research 17(3): 338–350

    Article  Google Scholar 

  • Banaszak Z., Zaremba M. (2006) Project-driven planning and scheduling support for virtual manufacturing. Journal of Intelligent Manufacturing 17(6): 641–651

    Article  Google Scholar 

  • Bitran G.R., Tirupati D. (1993) Handbooks in operations research and management science, (Vol. 4), Logistics of production and inventory, chap hierarchical production planning. Elsevier, Amsterdam, pp 523–568

    Google Scholar 

  • Elmaghraby S. E., Kamburowski J. (1992) The analysis of activity networks under Generalized Precedence Relations (gprs). Management Science 38(9): 1245–1263

    Article  Google Scholar 

  • Hackman S. T., Leachman R. C. (1989) An aggregate model of project-oriented production. IEEE Transactions on Systems, Man and Cybernetics 19(2): 220–231

    Article  Google Scholar 

  • Harris B., Lewis F., Cook D. J. (2002) A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints. Journal of Intelligent Manufacturing 13(4): 239–252

    Article  Google Scholar 

  • Hax, A. C., & Meal, H. C. (1975). Studies in the management sciences, vol. logistics, North-Holland, chap hierarchical integration of production planning and scheduling.

  • Hopp W. J., Spearman M. L. (2000) Factory physics : Foundations of manufacturing management. McGraw-Hill, New York

    Google Scholar 

  • Kis, T. (2005). A branch-and-cut algorithm for scheduling of projects with variable-intensity activities. Mathematical Programming.

  • Kis, T. (2006). Rcps with variable intensity activities and feeding precedence constraint. In Perspectives in modern project scheduling (pp. 105–129). New York: Springer.

  • Kovács A., Kis T. (2004) Partitioning of trees for minimizing height and cardinality. Information Processing Letters 89: 181–185

    Article  Google Scholar 

  • Leachman R. C., Dtncerler A., Kim S. (1990) Resource-constrained scheduling of projects with variable-intensity activities. IIE Transactions 22(1): 31–40

    Article  Google Scholar 

  • Márkus A., Váncza J., Kis T., Kovács A. (2003) Project scheduling approach for production planning. Annals of the CIRP 52(1): 359–362

    Article  Google Scholar 

  • Neumann K., Zhan J. (1995) Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing 6(2): 145–154

    Article  Google Scholar 

  • Tan W., Khoshnevis B. (2004) A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. Journal of Intelligent Manufacturing 15(5): 593–605

    Article  Google Scholar 

  • Toczylowski E., Pienkosz K. (1991) Restrictive aggregation of items in multi-stage production systems. Operations Research Letters 10(3): 159–163

    Article  Google Scholar 

  • Tolio, T., & Urgo, M. (2007). Planning of machining centres production: the role of precedence modelling. In Proceedings of the 7th AITeM congress.

  • Tolio, T., Urgo, M., & Alfieri, A. (2008). Project scheduling with variable intensity activities and feeding precedence relations: an application to production planning in Manufacturing-to-Order environments. In Proceedings of ESDA 2008, 9th biennial ASME conference on engineering systems design and analysis.

  • Váncza J., Kis T., Kovács A. (2004) Aggregation: The key to integrating production planning and scheduling. Annals of the CIRP 53(1): 374–376

    Article  Google Scholar 

  • Vollman T.E., Berry W.L., Whybark D.C. (1992) Manufacturing planning and control systems. Richard D. Irwin, Burr Ridge Ill

    Google Scholar 

  • Yalcin A., Boucher T. O. (2004) A continuous-time algorithm for disaggregation of hierarchical production plans. IIE Transactions 36(11): 1023–1035

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Marcello Urgo.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Alfieri, A., Tolio, T. & Urgo, M. A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments. J Intell Manuf 23, 575–585 (2012). https://doi.org/10.1007/s10845-010-0396-1

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10845-010-0396-1

Keywords

Navigation