Skip to main content
Log in

Modeling preventive maintenance of manufacturing processes with probabilistic Boolean networks with interventions

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

An Erratum to this article was published on 03 April 2017

This article has been updated

Abstract

Recent developments in intelligent manufacturing have validated the use of probabilistic Boolean networks (PBN) to model failures in manufacturing processes and as part of a methodology for Design Failure Mode and Effects Analysis (DFMEA). This paper expands the application of PBNs in manufacturing processes by proposing the use of interventions in PBNs to model an ultrasound welding process in a preventive maintenance (PM) schedule, guiding the process to avoid failure and extend its useful work life. This bio-inspired, stochastic methodology uses PBNs with interventions to model manufacturing processes under a PM schedule and guides the evolution of the network, providing a new mechanism for the study and prediction of the future behavior of the system at the design phase, assessing future performance, and identifying areas to improve design reliability and system resilience. A process engineer designing manufacturing processes may use this methodology to create new or improve existing manufacturing processes, assessing risk associated with them, and providing insight into the possible states, operating modes, and failure modes that can occur. The engineer can also guide the process and avoid states that can result in failure, and design an appropriate PM schedule. The proposed method is applied to an ultrasound welding process. A PBN with interventions model was simulated and verified using model checking in PRISM, generating data required to conduct inferential statistical tests to compare the effects of probability of failures between the PBN and PBN with Interventions models. The obtained results demonstrate the validity of the proposed methodology.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8

Similar content being viewed by others

Change history

  • 03 April 2017

    An erratum to this article has been published.

References

  • Arnosti, D. N., & Ay, A. (2012). Boolean modeling of gene regulatory networks: Driesch redux. Proceedings of the National Academy of Sciences, 109(45), 18239–18240.

    Article  Google Scholar 

  • Bane, V., Ravanmehr, V., & Krishnan, A. R. (2012). An information theoretic approach to constructing Robust Boolean gene regulatory networks. IEEE/ACM Transactions on Computational Biology and Bioinformatics, 9(1), 52–65.

    Article  Google Scholar 

  • Banerjee, A., & Burton, J. (1990). Equipment utilization based maintenance task scheduling in a job shop. European Journal of Operations Research, 45(2–3), 191–202.

    Article  Google Scholar 

  • Batun, S., & Azizoglu, M. (2009). Single machine scheduling with preventive maintenances. International Journal of Production Research, 47(1), 1753–1771.

    Article  Google Scholar 

  • Bittner, M. L., Meltzer, P., Chen, Y., Jiang, Y., Seftor, E., Hendrix, M., et al. (2000). Molecular classification of cutaneous malignant melanoma by gene expression profiling. Nature, 406(6795), 450–536.

    Article  Google Scholar 

  • Burton, J., Banerjee, A., & Sylla, C. (1989). A simulation study of sequencing and maintenance decisions in a dynamic job shop. Computers and Industrial Engineering, 17(1), 447–452.

    Article  Google Scholar 

  • Carlson, J. G. H., & Yao, A. C. (2008). Simulating an agile, synchronized manufacturing system. International Journal of Production Economics., 112, 714–722.

    Article  Google Scholar 

  • Cassady, C., & Kutanoglu, E. (2003). Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions, 35(6), 505–513.

    Article  Google Scholar 

  • Cavory, G., Dupas, R., & Gonçalves, G. (2001). A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. International Journal of Production Economics, 74(1–3), 135–146.

    Article  Google Scholar 

  • Chaouiya, C., Ourrad, O., & Lima, R. (2013). Majority rules with random Tie-breaking in Boolean gene regulatory networks. PLoS One, 8(7), e69626.

    Article  Google Scholar 

  • Chareonsuk, C., Nagarur, N., & Tabucanon, M. (1997). A multicriteria approach to the selection of preventive maintenance intervals. International Journal of Production Economics, 49, 55–65.

    Article  Google Scholar 

  • Chen, H., & Sun, J. (2014). Stability and stabilisation of context-sensitive probabilistic Boolean networks. IET Control Theory & Applications, 8(17), 2115–2121.

    Article  Google Scholar 

  • Chen, X., Jiang, H., & Ching, W.-K. (2012). On construction of sparse probabilistic Boolean networks. East Asian Journal on Applied Mathematics. https://doi.org/10.4208/eajam.030511.060911a.

    Article  Google Scholar 

  • Cheng, X., Sun, M., & Socolar, J. E. S. (2013). Autonomous Boolean modelling of developmental gene regulatory networks. Interface: Journal of the Royal Society, 10(78), 20120574.

    Google Scholar 

  • Ching, W.-K., Zhang, S.-Q., Jiao, Y., Akutsu, T., Tsing, N.-K., & Wong, A.-S. (2009). Optimal control policy for probabilistic Boolean networks with hard constraints. IET Systems Biology, 3(2), 90–99.

    Article  Google Scholar 

  • Choudhary, A. (2006). Intervention in gene regulatory networks. http://txspace.di.tamu.edu/bitstream/handle/1969.1/4284/etd-tamu-2006B-ELEN-Choudha.pdf?sequence=1.

  • Datta, A., Choudhary, A., Bittner, M. L., & Dougherty, E. R. (2003). External control in Markovian genetic regulatory networks. Machine Learning, 52, 169–191.

    Article  Google Scholar 

  • Datta, A., & Dougherty, E. R. (2006). Introduction to genomic signal processing with Control. Boca Raton, Fl: CRC Press.

    Book  Google Scholar 

  • Datta, A., Pal, R., Choudhary, A., & Dougherty, E. R. (2007). Control approaches for probabilistic gene regulatory networks. IEEE Signal Processing Magazine, 24(1), 54–63.

    Article  Google Scholar 

  • Didier, G., & Remy, E. (2012). Relations between gene regulatory networks and cell dynamics in Boolean models. Discrete Applied Mathematics, 160(15), 2147–2157.

    Article  Google Scholar 

  • Ebeling, C. E. (1997). An introduction to reliability and maintainability engineering. New York: McGraw-Hill.

    Google Scholar 

  • Gao, Y., Xu, P., Wang, X., & Liu, W. (2013). The complex fluctuations of probabilistic Boolean networks. Biosystems, 114(1), 78–84.

    Article  Google Scholar 

  • Ghanbarnejad, F. (2012). Perturbations in Boolean networks as model of gene regulatory dynamics (Doctoral Thesis). Leipzig, Germany: University of Leipzig.

    Google Scholar 

  • Gu, J.-W., Ching, W.-K., Siu, T.-K., & Zheng, H. (2013). On modeling credit defaults: a probabilistic Boolean network approach. Risk and Decision Analysis, 4(2), 119–129.

    Google Scholar 

  • Hopfensitz, M., Müssel, C., & Maucher, M. (2012). Attractors in Boolean networks: a tutorial. Computational Statistics. http://www.springerlink.com.ezproxy.library.wisc.edu/index/NR1671N55Q3365Q5.pdf

  • Hu, X., & An, R. (2011). Modeling and simulation of manufacturing systems in unstable environments. In Proceedings of the world congress on engineering (WCE). London, UK.

  • Kauffman, S. A. (1969). Homeostasis and differentitation in random genetic control networks. Nature, 224, 177–178.

    Article  Google Scholar 

  • Kauffman, S. A. (1993). The origins of order: self-organization and selection in evolution. NewYork: Oxford University Press.

    Google Scholar 

  • Kobayashi, K., & Hiraishi, K. (2010). Reachability analysis of probabilistic Boolean networks using model checking (pp. 829–832). Proceedings of presented at the SICE annual conference 2010. http://library.uprm.edu:2055/stamp/stamp.jsp?tp=&arnumber=5604207.

  • Kumar, R. U. (2013). Simulation and modeling analysis in manufacturing process. International Journal of Recent Technology and Engineering, 1(6), 90–92.

    Google Scholar 

  • Kwiatkowska, M. Z., Norman, G., & Parker, D. (2011). PRISM 4.0: verification of probabilistic real-time systems. In Lecture Notes in Computer Science, Vol. 6806 (pp. 585–591). Springer.

  • Law, A. M., & McComas, M. G. (1997). Simulation of manufacturing systems. In Proceedings of the 1997 winter simulation conference (pp. 86–89). Atlanta, GA.

  • Liang, R., Qiu, Y., & Ching, W.-K. (2014). Construction of probabilistic Boolean network for credit default data. In Proceedings of the seventh international joint conference on computational science and optimization. Presented at the seventh international joint conference on computational science and optimization.

  • Mosley, S., Teyner, T., & Uzsoy, R. (1998). Maintenance scheduling and staffing policies in a wafer fabrication facility. Transactions in Semiconductor Manufacturing, 11(2), 316–323.

    Article  Google Scholar 

  • Pal, R., Datta, A., Bittner, M., & Dougherty, E. (2005). Intervention in context-sensitive probabilistic Boolean networks. Bioinformatics, 21(7), 1211–1218. https://doi.org/10.1093/bioinformatics/bti131.

    Article  Google Scholar 

  • Pan, E., Liao, W., & Xi, L. (2010). Single-machine-based production scheduling model integrated preventive maintenance planning. International Journal of Advanced Manufacturing Technology, 54(2), 304–309.

    Google Scholar 

  • Prokopenko, M. (2009). Guided self-organization. HFSP Journal, 3(5), 287–289.

    Google Scholar 

  • Rivera Torres, P. J., Serrano Mercado, E.I., & Anido Rifón, L. (2015a). Probabilistic Boolean network modeling of an industrial machine. Journal of Intelligent Manufacturing. https://doi.org/10.1007/s10845-015-1143-4.

    Article  Google Scholar 

  • Rivera Torres, P. J., Serrano Mercado, E.I., & Anido Rifón, L.(2015b). Probabilistic Boolean network modeling and model checking as an approach for DFMEA for manufacturing systems. Journal of Intelligent Manufacturing. https://doi.org/10.1007/s10845-015-1183-9.

    Article  Google Scholar 

  • Shmulevich, I., & Dougherty, E. R. (2007). Genomic signal processing, 1st edn. Vols. 1–1, Vol. 1. Princeton: Princeton University Press.

    Google Scholar 

  • Shmulevich, I., Dougherty, E., & Kim, S. (2002a). Probabilistic Boolean networks: a rule-based uncertainty model for gene regulatory networks. Bioinformatics. http://bioinformatics.oxfordjournals.org.ezproxy.library.wisc.edu/content/18/2/261.short.

  • Shmulevich, I., & Dougherty, E. R. (2010). Probabilistic Boolean networks: modeling and control of gene regulatory networks. Philadelphia, PA: SIAM.

    Book  Google Scholar 

  • Shmulevich, I., Dougherty, E. R., Kim, S., & Zhang, W. (2002b). From Boolean to probabilistic Boolean networks as models of genetic regulatory networks. Proceedings of the IEEE, 90, 1778–1792.

    Article  Google Scholar 

  • Smith, J. S. (2003). Survey on the use of simulation for manufacturing system design and operation. Journal of Manufacturing Systems., 22(2), 157–171.

    Article  Google Scholar 

  • Sortrakul, N., Nachtmann, H. L., & Cassady, C. R. (2005). Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Computers in Industry, 56, 161–168.

    Article  Google Scholar 

  • Trairatphisan, P., Mizera, A., Pang, J., Tantar, A. A., Schneider, J., & Sauter, T. (2013). Recent development and biomedical applications of probabilistic Boolean networks. Cell Communication and Signaling, 11, 46.

    Article  Google Scholar 

  • Vahedi, Golnaz (2009). An engineering approach towards personalized cancer therapy. Doctoral dissertation, Texas A&M University. http://hdl.handle.net/1969.1/ETD-TAMU-2009-08-2941.

  • Verma, A., & Ramesh, P. (2007). Multi-objective initial preventive maintenance scheduling for large engineering plants. International Journal of Reliability Quality and Safety Engineering, 14(3), 241–250.

    Article  Google Scholar 

  • Wang, J., Wang, H., Zhang, W., Ip, W., & Furuta, K. (2014a). On a unified definition of the service system: What is its identity? IEEE Systems Journal, 8(3), 821–826.

    Article  Google Scholar 

  • Wang, X., Wang, H., & Qi, C. (2016). Multi-agent reinforcement learning based maintenance policy for a resource constrained flow line system. Journal of Intelligent Manufacturing, 27(2), 325–333. https://doi.org/10.1007/s10845-013-0864-5.

    Article  Google Scholar 

  • Yulan, J., Zuhua, J., & Wenrui, H. (2008). Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. International Journal of Advanced Manufacturing Technology, 39, 954–964.

    Article  Google Scholar 

  • Zhang, W. J., & Van Luttervelt, C. A. (2011). Toward a resilient manufacturing system. CIRP Annals-Manufacturing Technology, 39(1), 469–472.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Pedro J. Rivera Torres.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Rivera Torres, P.J., Serrano Mercado, E.I., Llanes Santiago, O. et al. Modeling preventive maintenance of manufacturing processes with probabilistic Boolean networks with interventions. J Intell Manuf 29, 1941–1952 (2018). https://doi.org/10.1007/s10845-016-1226-x

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10845-016-1226-x

Keywords

Navigation