Abstract
We consider a series repairable system that includes n components and assume that it has just failed because exactly one of its components has failed. The failed component is unknown. Probability of each component to be responsible for the failure is given. Each component can be tested and repaired at given costs. Both testing and repairing operations are assumed to be perfect, that is, the result of testing a component is a true information that this component is failed or active (not failed), and the result of repairing is that the component becomes active. The problem is to find a sequence of testing and repairing operations over the components such that the system is always repaired and the total expected cost of testing and repairing the components is minimized. We show that this problem is equivalent to minimizing a quadratic pseudo-boolean function. Polynomially solvable special cases of the latter problem are identified and a fully polynomial time approximation scheme (FPTAS) is derived for the general case. Computer experiments are provided to demonstrate high efficiency of the proposed FPTAS. In particular, it is able to find a solution with relative error ɛ = 0.1 for problems with more than 4000 components within 5 minutes on a standard PC with 1.2 Mhz processor.
Access this article
We’re sorry, something doesn't seem to be working properly.
Please try refreshing the page. If that doesn't work, please contact support so we can address the problem.
Similar content being viewed by others
References
Badics T, Boros E (1998) Minimization of half-products. Math Oper Res 23:649–660
Boros E, Hammer PL (2002) Pseudo-boolean optimization. Discrete Appl Math 123:155–225
Janiak A, Kovalyov MY, Kubiak W, Werner F (2005) Positive half-products and scheduling with controllable processing times. Europ J Oper Res 165:416–422
Kovalyov MY, Kubiak W (1999) Fully polynomial approximation schemes for decomposable partition problems. In: Operations Research Proceedings 1999, Selected papers of the symposium on operations research (SOR’99). Magdeburg, pp 397–401
Nachlas JA, Loney SR, Biney BA (1990) Diagnostic-strategy selection for series systems. IEEE Trans Reliab 39:273–280
Smith WE (1956) Various optimizers for single-stage production. Naval Res Log Quart 3:59–66
Tissellin G, Portmann M-C (2003) Exact methods for testing and repairing a failed complex system with a minimal average cost. In: International conference on industrial engineering and production management—IEPM’2003, vol. 3. Porto, Portugal, pp 492–501
Xiaozhong W, Cooke RM (1992) Optimal inspection sequence in fault diagnosis. Reliab Enging Syst Safety 37:207–210
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Kovalyov, M.Y., Portmann, MC. & Oulamara, A. Optimal testing and repairing a failed series system. J Comb Optim 12, 279–295 (2006). https://doi.org/10.1007/s10878-006-9633-0
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10878-006-9633-0