On lazy bureaucrat scheduling with common deadlines

  • Published:
Journal of Combinatorial Optimization Aims and scope Submit manuscript

Abstract

Lazy bureaucrat scheduling is a new class of scheduling problems introduced by Arkin et al. (Inf. Comput. 184:129–146, 2003). In this paper we focus on the case where all the jobs share a common deadline. Such a problem is denoted as CD-LBSP, which has been considered by Esfahbod et al. (Algorithms and data structures. Lecture notes in computer science, vol. 2748, pp. 59–66, 2003). We first show that the worst-case ratio of the algorithm SJF (Shortest Job First) is two under the objective function [min-time-spent], and thus answer an open question posed in (Esfahbod, et al. in Algorithms and data structures. Lecture notes in computer science, vol. 2748, pp. 59–66, 2003). We further present two approximation schemes A k and B k both having worst-case ratio of \(\frac{k+1}{k}\) , for any given integer k>0, under the objective functions [min-makespan] and [min-time-spent], respectively. Finally, we prove that the problem CD-LBSP remains NP-hard under several objective functions, even if all jobs share the same release time.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Arkin EM, Bender MA, Mitchell JSB, Skiena SS (2003) The lazy bureaucrat scheduling problem. Inf Comput 184:129–146

    Article  MATH  MathSciNet  Google Scholar 

  • Esfahbod B, Ghodsi M, Sharifi A (2003) Common-deadline lazy bureaucrat scheduling problems. In: Dehne FKHA, Sack J-R Smid MHM (eds) Algorithms and data structures. Lecture notes in computer science, vol 2748. Springer, Berlin, pp 59–66

    Google Scholar 

  • Gary MR, Johnson DS (1979) A guide to the theory of NP-completeness. Freeman, San Francisco

    Google Scholar 

  • Goemans MX, Williamaon DP (1995) Improved approximation algorithms for maximum cut and satisfiability problems using semidefinite programming. J ACM 42:1115–1145

    Article  MATH  Google Scholar 

  • Hassin R, Rubinstein S (1998) An approximation algorithm for the maximum traveling salesman problem. Inf Process Lett 67:125–130

    Article  MathSciNet  Google Scholar 

  • Hepner C, Stein C (2002) Minimizing makespan for the lazy bureaucrat problem. In: Penttonen M Schmidt EM (eds) Algorithm theory. Lecture notes in computer science, vol 2368. Springer, Berlin, pp 40–50

    Google Scholar 

  • Karger D, Motwani R, Ramkumar G (1997) On approximating the longest path in a graph. Algorithmica 18:82–98

    Article  MATH  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Guochuan Zhang.

Additional information

A preliminary version of the paper appeared in Proceedings of the 7th Latin American Symposium on Theoretical Informatics, pp 515–523, 2006.

Research of G. Zhang supported in part by NSFC (60573020).

Rights and permissions

Reprints and permissions

About this article

Cite this article

Gai, L., Zhang, G. On lazy bureaucrat scheduling with common deadlines. J Comb Optim 15, 191–199 (2008). https://doi.org/10.1007/s10878-007-9076-2

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10878-007-9076-2

Keywords

Navigation