Abstract
We are concerned with problems of scheduling jobs non-preemptively with the objective to maximize the weighted number of jobs that are completed exactly at their due dates. It has been shown that the problems for single machine and identical parallel machines are polynomial time solvable. The purpose of this paper is to establish the complexity status of the problem for unrelated parallel machine, which was left open. First, we present a polynomial time algorithm for solving the problem when the number of machine is fixed. Second, we show that when the number of machine is a part of input, the problem becomes NP-hard in the strong sense.
Similar content being viewed by others
References
Čepek, O. and S. C. Sung, “A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines,” accepted by Computers & Operations Research, 2004.
Garey, M. R. and D. S. Johnson, Computers and Intractability: A Guide to the Theory of NP-Completeness, W. H. Freeman, San Francisco, 1979.
Gavril, F., “Algorithms for minimizing coloring, maximum clique, minimum covering by cliques, and maximum independent set of a chordal graph,” SIAM Journal on Computing, 1(2), 180–187 (1972).
Hiraishi, K., E. Levner, and M. Vlach, “Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs,” Computers & Operations Research, 29(7), 841–848 (2002).
Lann, A. and G. Mosheiov, “Single machine scheduling to minimize the number of early and tardy jobs,” Computers & Operations Research 23, 765–781 (1996).
Lawler, E. L., J. K. Lenstra, A. H. G. Rinnooy Kan and D. B. Shmoys, “Sequencing and scheduling, Algorithms and complexity,” in S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds.), Handbooks in Operations Research and Management Science, Vol. 4, Amsterdam, 1993, pp. 455–522.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Sung, S.C., Vlach, M. Maximizing Weighted number of Just-in-Time Jobs on Unrelated Parallel Machines. J Sched 8, 453–460 (2005). https://doi.org/10.1007/s10951-005-2863-7
Issue Date:
DOI: https://doi.org/10.1007/s10951-005-2863-7