Abstract
In this paper, we consider the following semi-online List Model problem with known total size. We are given a sequence of independent jobs with positive sizes, which must be assigned to be processed on machines. No machines are initially provided, and when a job is revealed the algorithm has the option to purchase new machines. By normalizing all job sizes and machine cost, we assume that the cost of purchasing one machine is 1. We further know the total size of all jobs in advance. The objective is to minimize the sum of the makespan and the number of machines to be purchased. Both non-preemptive and preemptive versions are considered. For the non-preemptive version, we present a new lower bound 6/5 which improves the known lower bound 1.161. For the preemptive version, we present an optimal semi-online algorithm with a competitive ratio of 1 in the case that the total size is not greater than 4, and an algorithm with a competitive ratio of 5/4 otherwise, while a lower bound 1.0957 is also presented for general case.
Similar content being viewed by others
References
Imreh C, Noga J. Scheduling with machine cost. In Proc. RANDOM-APPROX’99, Berkley, USA, Lecture Notes in Computer Science, 1999, 1671: 168–176.
Dósa G, He Y. Better on-line algorithms for scheduling with machine cost. SIAM J. Computing, 2004, 33: 1035–1051.
Jiang Y, He Y. Preemptive online algorithms for scheduling with machine cost. Acta Informatica, 2005, 41: 315–340.
He Y, Cai S. Semi-online scheduling with machine cost. Journal of Computer Science and Technology, 2002, 17: 781–787.
Cai S, He Y. Quasi-online algorithms for scheduling non-increasing processing jobs with processor cost. Acta Automatica Sinica, 2003, 29: 917–921. (in Chinese)
Graham R L. Bounds on multiprocessing finishing anomalies. SIAM Journal on Applied Mathematics, 1969, 17(4): 416–429.
He Y, Zhang G. Semi-online scheduling on two identical machines. Computing, 1999, 62: 179–187.
Kellerer H, Kotov V, Speranza M R, Tuza Z. Semi on-line algorithms for the partition problem. Operations Research Letters, 1997, 21: 235–242.
Dósa G, He Y. Semi-online algorithms for parallel machine scheduling problems. Computing, 2004, 72: 355–363.
Epstein L. Bin stretching revisited. Acta Informatica, 2003, 39: 97–117.
He Y, Jiang Y. Optimal algorithms for semi-online preemptive scheduling problems on two uniform machines. Acta Informatica, 2004, 40: 367–383.
Seiden S. A guessing game and randomized online algorithms. In Proc. the 32nd Annual ACM Symposium on the Theory of Computing, ACM, New York, 2000, pp.592–601.
McNaughton R. Scheduling with deadlines and loss functions. Management Sciences, 1959, 6: 1–12.
Author information
Authors and Affiliations
Corresponding author
Additional information
Research supported by the Natural Science Foundation of Zhejiang Province (Grant No. Y605316), and Natural Science Foundation of Education Department of Zhejiang Province (Grant No. 20060578).
Rights and permissions
About this article
Cite this article
Jiang, YW., He, Y. Semi-Online Algorithms for Scheduling with Machine Cost. J Comput Sci Technol 21, 984–988 (2006). https://doi.org/10.1007/s11390-006-0984-x
Received:
Revised:
Issue Date:
DOI: https://doi.org/10.1007/s11390-006-0984-x