Abstract
This paper investigates permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines. In the proposed models, we need to make joint decisions on part families sequencing and jobs sequencing within each family. To solve the makespan minimization problem, the structural properties of the optimal solutions are derived, based on which an optimization algorithm is developed. Then, we consider the total completion time minimization problem and propose a useful lemma for the optimal solutions. Finally, we discuss two special cases of the problem and propose optimization algorithms to solve them respectively.
Similar content being viewed by others
References
Cheng, M., Tadikamalla, P.R., Shang, J., Zhang, B.: Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time. J. Oper. Res. Soc. 66(5), 709–719 (2015)
Cheng, M., Tadikamalla, P.R., Shang, J., Zhang, S.: Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs. Eur. J. Oper. Res. 234(3), 650–657 (2014)
Cheng, T.C.E., Ding, Q., Lin, B.M.T.: A concise survey of scheduling with time-dependent processing times. Eur. J. Oper. Res. 152, 1–13 (2004)
Fan, W., Pei, J., Liu, X., Pardalos, P.M., Kong, M.: Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning. J. Glob. Optim. (2017). https://doi.org/10.1007/s10898-017-0536-7
Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5(1), 287–326 (1979)
He, N., Qiao, Y., Wu, N., Qu, T.: Total completion time minimization for scheduling of two-machine flow shop with deterioration jobs and setup time. Adv. Mech. Eng. 9(4), 1687814017698887 (2017)
Hendizadeh, S.H., ElMekkawy, T.Y., Wang, G.G.: Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times. Eur. J. Ind. Eng. 1(4), 391–413 (2007)
Ho, J.C., Gupta, J.N.D.: Flowshop scheduling with dominant machines. Comput. Oper. Res. 22(2), 237–246 (1995)
Kampmeyer, M., Knust, S., Waldherr, S.: Solution algorithms for synchronous flow shop problems with two dominating machines. Comput. Oper. Res. 74, 42–52 (2016)
Koulamas, C., Kyparisis, G.J.: Single-machine scheduling problems with sequence dependent setup times. Eur. J. Oper. Res. 187(3), 1045–1049 (2008)
Lee, W.C., Wu, C.C., Chung, Y.H., Liu, H.C.: Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates. Comput. Oper. Res. 36(6), 2111–2121 (2009)
Lin, B.M.T., Cheng, T.C.E.: Two machine flowshop scheduling with conditional deteriorating second operations. Int. Trans. Oper. Res. 13(2), 91–98 (2006)
Lin, S.W., Ying, K.C.: Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times. Eur. J. Ind. Eng. 6(4), 474–496 (2012)
Liu, P., Yi, N., Zhou, X., Gong, H.: Scheduling two agents with sum-of-processing-times-based deterioration on a single machine. Appl. Math. Comput. 219(17), 8848–8855 (2013)
Liu, X., Lu, S., Pei, J., Pardalos, P.M.: A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs. Int. J. Prod. Res. (2017). https://doi.org/10.1080/00207543.2017.1418986
Lu, Y.Y.: Research on no-idle permutation flowshop scheduling with time-dependent learning effect and deteriorating jobs. Appl. Math. Model. 40(4), 3447–3450 (2016)
Nowicki, E., Smutnicki, C.: A fast tabu search algorithm for the permutation flow-shop problem. Eur. J. Oper. Res. 91(1), 160–175 (1996)
Oron, D.: Scheduling controllable processing time jobs in a deteriorating environment. J. Oper. Res. Soc. 65(1), 49–56 (2014)
Osman, I.H., Potts, C.N.: Simulated annealing for permutation flow-shop scheduling. Omega 17(6), 551–557 (2009)
Pei, J., Pardalos, P.M., Liu, X., Fan, W., Yang, S.: Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur. J. Oper. Res. 244(1), 13–25 (2015)
Pei, J., Liu, X., Pardalos, P.M., Fan, W., Yang, S.: Single machine serial-batching scheduling with independent setup time and deteriorating job processing times. Optim. Lett. 9(1), 91–104 (2015)
Pei, J., Liu, X., Pardalos, P.M., Migdalas, A., Yang, S.: Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine. J. Glob. Optim. 67(1–2), 251–262 (2017)
Pei, J., Liu, X., Pardalos, P.M., Fan, W., Yang, S.: Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times. Ann. Oper. Res. 249(1–2), 175–195 (2017)
Pei, J., Liu, X., Fan, W., Pardalos, P.M., Lu, S.: A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers. Omega (2017). https://doi.org/10.1016/j.omega.2017.12.003
Sun, L.H., Sun, L.Y., Wang, M.Z., Wang, J.B.: Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines. Int. J. Prod. Econ. 138(1), 195–200 (2012)
Tang, L., Zhao, X., Liu, J., Leung, J.Y.T.: Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine. Eur. J. Oper. Res. 263, 401–411 (2017)
Wang, J.B., Li, L.: Machine scheduling with deteriorating jobs and modifying maintenance activities. Comput. J. 61, 1–7 (2017)
Wang, J.B., Wang, M.Z.: Minimizing makespan in three-machine flow shops with deteriorating jobs. Comput. Oper. Res. 40(2), 547–557 (2013)
Wang, J.B., Lin, L., Shan, F.: Flow shop scheduling with effects of learning and deterioration. J. Appl. Math. Comput. 26(1–2), 367–379 (2008)
Wang, L., Sun, L.Y., Sun, L.H., Wang, J.B.: On three-machine flow shop scheduling with deteriorating jobs. Int. J. Prod. Econ. 125(1), 185–189 (2010)
Yan, H.S., Li, W.C.: A scheduling procedure for a flow shop-like knowledgeable manufacturing cell with self-evolutionary features. Proc. Inst. Mech. Eng. Part B J. Eng. Manuf. 230(12), 2296–2306 (2016)
Yin, Y., Wang, Y., Cheng, T.C.E., Liu, W., Li, J.: Parallel-machine scheduling of deteriorating jobs with potential machine disruptions. Omega 69, 17–28 (2017)
Ying, K.C., Lee, Z.J., Lu, C.C., Lin, S.W.: Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups. Int. J. Adv. Manuf. Technol. 58(5), 671–682 (2012)
Acknowledgements
This work is supported by the National Natural Science Foundation of China (Nos. 71231004, 71601065, 71690235, 71501058, 71601060), and Innovative Research Groups of the National Natural Science Foundation of China (71521001), the Humanities and Social Sciences Foundation of the Chinese Ministry of Education (No. 15YJC630097), Anhui Province Natural Science Foundation (No. 1608085QG167), Base of Introducing Talents of Discipline to Universities for Optimization and Decision-making in the Manufacturing Process of Complex Product (111 project), Fundamental Research Funds for the Central Universities (JZ2018HGTA0222, JZ2018HGBZ0113). Panos M. Pardalos is partially supported by the project of Distinguished International Professor by the Chinese Ministry of Education (MS2014HFGY026).
Author information
Authors and Affiliations
Corresponding authors
Rights and permissions
About this article
Cite this article
Lu, S., Liu, X., Pei, J. et al. Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines. Optim Lett 15, 537–551 (2021). https://doi.org/10.1007/s11590-018-1322-2
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11590-018-1322-2