Abstract
The importance of the manufacturing shop design in the successful operation of a production system is well documented and, as a result, significant work has been devoted to this area. Due to the inherent complexity of the global shop design problem, much research has focused on individual sub-problems, including the layout of manufacturing resources, the design of the shop aisle network, and the selection of the material handling equipment, rather than addressing the integrated problem directly. This paper reviews literature contributions to shop design integration, as well as partial integration schemes such as the design for operation and control of material handling systems. Furthermore, it examines the ability of models and solution approaches for individual sub-problems of shop design to support integration schemes.
Similar content being viewed by others
References
Afentakis, P. (1989) A loop layout design problem for flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 1(2), 143–175.
Allegri, T. M. Sr (1984) Material Handling: Principles and Practices, Van Nostrand Reinold, New York.
Ang, C. L. and Willey, P. T. (1984) A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation techniques. International Journal of Production Research, 22(2), 193–233.
Apple, J. M. and McGinnis, L. F. (1987) Innovations in facilities design and material handling systems. Industrial Engineering, 13(3), 33–38.
Armour, G. C. and Buffa, E. S. (1963) A heuristic algorithm and simulation approach to the relative location of facilities. Management Science, 9(1), 294–309.
Ashayeri, J. (1989) Analytical approaches in AGVS flow path design, in Proceedings of the 5th International Conference on Simulation in Manufacturing, Berlin, pp. 95–107.
Bahl, H. C. (1983) Column generation–based heuristic algorithm for multi-item scheduling. IIE Transactions, 15(2), 136–141.
Balakrishnan, A., Magnanti, T. L. and Wong, R. T. (1989) A dual-ascent procedure for large-scale uncapacitated network design. Operations Research, 37(5), 716–740.
Banerjee, P. and Zhou, Y. (1993) Simultaneous optimization of manufacturing cell layout and inter-cell material flow path, in Proceedings of the 1993 NSF Design and Manufacturing Systems Conference, Charlotte, NC, pp. 959–961.
Banerjee, P. and Zhou, Y. (1995) Facilities layout design optimization with single loop material flow path configuration. International Journal of Production Research, 33(1), 183–203.
Banerjee, P., Montreuil, B., Moodie, C. L. and Kashyap, R. L. (1992) A modeling of interactive facilities layout designer reasoning using qualitative patterns. International Journal of Production Research, 30(3), 433–453.
Bartholdi, J. J. III and Platzmann, L. K. (1988) Decentralized control of a fixed route automated guided vehicle system. IIE Transactions, 21(1), 76–81.
Bohlander, R. A., Holcombe, W. D. and Larsen, J. W. (1990) An advanced AGV control system: an example of integrated design and control, in Progress in Material Handling and Logistics., vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 471–487.
Bozer, Y. A. and Srinivasan, M. M. (1991) Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops. IIE Transactions, 23(1), 23–27.
Bozer, Y. A. and Srinivasan, M. M. (1992) Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems. European Journal of Operational Research, 63(2), 173–191.
Bozer, Y. A., Meller, R. D. and Erlebacher, S. J. (1994) An improvement type layout algorithm for single and multiple-floor facilities. Management Science, 40(7), 918–932.
Cattrysse, D., Maes, J. and Van Wassenhove, L. N. (1990) Set partitioning and column generation heuristics for the ca– pacitated dynamic lot sizing. European Journal of Operational Research, 46(1), 38–47.
Chhajed, D., Montreuil, B. and Lowe, T. J. (1992) Flow network design for manufacturing systems layout. European Journal of Operational Research, 57(2), 145–161.
Crama, Y. and Oerlemans, A. G. (1994) A column generation approach to job grouping for flexible manufacturing systems. European Journal of Operational Research, 78(1), 58–80.
Delaney, D., Herrmann, J., Ioannou, G., Lu, T., Minis, I., Mirza, A. H. and Palmer, R. (1995) Design and implementation of a hybrid manufacturing facility. Computers and Industrial Engineering, 29(1–4), 315–319.
Desrochers, M. and Soumis, F. (1989) A column generation approach to the urban transit crew scheduling problem. Transportation Science, 23(1), 1–13.
Desrosiers, J., Dumas, Y., Solomon, M. M., and Soumis, F. (1994) Time constrained routing and scheduling, in Handbook in Operations Research and Management Science, Ball, M. E., Magnanti, T. L., Monma, C. and Nemhauser, G. L. (eds), volume on Networks. Konrad-Zuse-Zentrum für In– formationstechnik, Berlin, Germany.
Dowlatshahi, S. (1994) A modeling approach to design of integrated facilities. International Journal of Production Research, 32(6), 1313–1330.
Eastman, R. M. (1987) Materials Handling, Industrial Engineering Series, vol. 15, Marcel Dekker, New York-Basel.
Egbelu, P. J. (1987) The use of non–simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow, 4(1) 17–32.
Egbelu, P. J. and Tanchoco, J. M. A. (1982) AGV Sim User's manual. Technical Report 8204, Department of Industrial Engineering and Operations Research, Virginia Tech, Blacksburg, VA.
Egbelu, P. J. and Tanchoco, J. M. A. (1984) Characterization of automatic guided vehicle dispatching rules. International Journal of Production Research, 22(3), 359–374.
Egbelu, P. J. and Tanchoco, J. M. A. (1986) Potentials for bi-directional guide path for automated guided vehicle based systems. International Journal of Production Research, 24(5), 1075–1097.
Evans, G. W., Wilhelm, M. R. and Usher, J. S. (1990) A modular algorithm for presimulation design of automatic guided vehicle systems, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 501–513.
Foulds, L. R. (1983) Techniques for facilities layout: deciding which pairs of activities should be adjacent. Management Science, 29(12), 1414–1426.
Francis, R. L., McGinnis, L. F. Jr and White, J. A. (1992) Facility Layout and Location: an Analytical Approach, 2nd edn, Prentice Hall, Englewood Cliffs, NJ.
Gaskins, R. J. and Tanchoco, J. M. A. (1987) Flow path design for automated guided vehicle systems. International Journal of Production Research, 25(5), 667–676.
Gaskins, R. J., Tanchoco, J. M. A. and Taghaboni, F., (1989) Virtual flow paths for free–range automated guided vehicle systems. International Journal of Production research, 27(1), 91–100.
Goetz, W. J. Jr and Egbelu, P. J. (1990) Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system. International Journal of Production Research, 28(5), 927–941.
Golden, B. L. and Assad, A. A. (1988) Vehicle Routing: Methods and Studies, Elsevier Science Publishers, Amsterdam.
Hanan, M. and Kurtzberg, J. M. (1972) A review of the placement and quadratic assignment problems. SIAM Review, 14(2), 324–341.
Hassan, M. M. D. (1994) Machine layout problem in modern manufacturing facilities. International Journal of Production Research, 32(11), 2559–2584.
Heragu, S. S. (1992) Recent models and techniques for solving the layout problem. European Journal of Operational Research, 57(2), 136–144.
Heragu, S. S. and Kusiak, A. (1988) Machine layout problem in flexible manufacturing systems. Operations Research, 36(2), 258–268.
Heragu, S. S. and Kusiak, A. (1991) Efficient models for the facility layout problem. European Journal of Operational Research, 53(1), 1–13.
Herrmann, J. W., Ioannou, G., Minis, I. and Proth, J. M. (1996) A dual ascent approach to the fixed charge capacitated network design problem. European Journal of Operational Research, 95(3), 476–490.
Herrmann, J. W., Ioannou, G., Minis, I., Nagi, R. and Proth, J. M. (1995a) Design of material flow networks in manufacturing facilities. Journal of Manufacturing Systems, 14(4), 277–289.
Herrmann, J. W., Ioannou, G., Minis, I. and Proth, J. M. (1995b) Minimization of acquisition and operational costs in horizontal material handling system design. Technical Report TR95-12, Institute for Systems Research, University of Maryland, College Park, MD.
Ioannou, G. (1995) Integrated manufacturing facility design. Ph. D. Dissertation, Ph. D-07, Institute for Systems Research, University of Maryland, College Park, MD.
Ioannou, G. (1996) Integrating shop layout and material handling system design decisions, in Progress in Material handling decisions, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R., (eds.) Braun-Brumfield, Inc., Ann Arbor, MI, pp. 227–244.
Ioannou, G. and Minis, I. (1995) An integrated model for manufacturing shop design, Technical report TR 95-106, Institute for Systems Research, University of Maryland, College Park, MD.
Jacobs–Blecha, C. and Goetschalckx, M. (1992) Analysis of horizontal transportation systems with multi–load carriers, in Proceedings of the 1992 NSF Design and Manufacturing Systems Conference, Atlanta, GA, pp. 871–874.
Jaw, J., Odoni, A., Psaraftis, H. N. and Watson, N. (1986) A heuristic algorithm for the multi-vehicle advance-request dial-a-ride problem with time windows. Transportation Science, 20(5), 243–257.
Johnson, M. E. and Brandeau, M. L. (1991) Integrated design and control of automated guided vehicle systems, in ASME Annual Meeting: Planning and Control of Material Handling Systems, MHD-vol.1, pp. 17–31.
Johnson, M. E. and Brandeau, M. L. (1992) Analytical models for design of automated guided vehicle systems, in Proceedings of the 1992 NSF Design and Manufacturing Systems Conference, Atlanta, GA, pp. 537–540.
Johnson, M. E. and Brandeau, M. L. (1995) Design of an auto– mated shop floor material handling system with inventory considerations, Working Paper, Department of Industrial Engineering, Stanford University, Stanford, CA 94305.
Kaspi, M. and Tanchoco, J. M. A. (1990) Optimal flow path design of unidirectional AGV systems. International Journal of Production Research, 28(6), 1023–1030.
Kim, H. K. and Tanchoco, J. M. A. (1991) Flow path design of fixed-path material handling systems, in ASME Annual Meeting: Planning and Control of Material Handling Systems, MHD-vol. 1, pp. 33–40.
Kim, H. K. and Tanchoco, J. M. A. (1993) Economical design of material flow paths. International Journal of Production Research, 31(6), 1387–1407.
Kim, H. K. and Tanchoco, J. M. A. (1994) Reachability in material flow path design, in Material Flow Systems in Manufacturing, Tanchoco, J. M. A. (ed.), Chapman & Hall, London, pp. 159–176.
Kouvelis, P. and Kim, M. W. (1992) Unidirectional loop network layout problem in automated manufacturing systems. Operations Research, 40(3), 533–550.
Kouvelis, P., Gutierrez, G. J. and Chiang, W. C. (1992) Heuristic unidirectional flow path design approaches for automated guided vehicle systems. International Journal of Production Research, 30(6), 1327–1351.
Kusiak, A. and Heragu, S. S. (1987) The facility layout problem. European Journal of Operational Research, 29(3), 229–253.
Lacksonen, T. (1995) Integrating material flow into a concurrent engineering framework, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 263–276.
Langevin, A., Montreuil, B. and Riopel, D. (1994) Spine layout design. International Journal of Production Research, 32(2), 429–442.
Laporte, G. (1992) The vehicle routing problem: an overview of exact and approximate algorithms, European Journal of Operational Research, 59(2), 345–358.
Li, C–L., Simchi–Levi, D. and Desrochers, M. (1992) On the distance constrained vehicle routing problem. Operations Research, 40(2), 790–799.
Magnanti, T. L. and Mirchandani, P. (1993) Shortest paths, single origin–destination network design, and associated polyhedra. Networks, 23(1), 103–121.
Magnanti, T. L. and Wong, R. T. (1984) Network design and transportation planning: models and algorithms. Transportation Science, 18(1), 1–55.
Malmborg, C. J. (1990) A model for the design of zone control automated guided vehicle systems. International Journal of Production Research, 28(10), 1741–1758.
Maxwell, W. L. and Muckstadt, J. A. (1982) Design of automated guided vehicle systems. IIE Transactions, 14(2), 114–124.
Maxwell, W. L. and Wilson, R. C. (1981) Dynamic network flow modeling of fixed path material handling systems. AIIE Transactions, 13(1), 12–21.
McGinnis, L. F. (1990) Computer–aided facilities design revisited: a prototype design workstation for AGV systems, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W., Springer-Verlag, pp. 67–93.
Meller, R. D. and Gau, K.-Y. (1996) The facility layout problem: recent and emerging trends and perspectives. Journal of Manufacturing Systems, 15(5), 351–366.
Montreuil, B. (1990) A modeling framework for integrating lay-out design and flow network design, in Progress in Material Handling and Logistics, vol. 2, White, J. A. and Pence, I. W. (eds), Springer-Verlag, pp. 95–115.
Montreuil, B. and Ratliff, H. D. (1989) Utilizing cut trees as design skeletons for facility layout. IIE Transactions, 21(2), 136–143.
Montreuil, B., Venkatardi, U. and Ratliff, H. D. (1993) Generating a layout from a design skeleton. IIE Transactions, 25(1), 3–15.
Nemhauser, G. L. and Wolsey, L. A. (1988) Integer and Combinatorial Optimization, John Wiley Interscience, New York.
Newton, D. (1985) Simulation model calculates how many automated guided vehicles are needed. Industrial Engineering, 17(2), 69–78.
Peters, B. A. and Yang, T. (1996) Facility layout and material handling system design integration in manufacturing sys– tems, in Progress in Material Handling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 467–482.
Proth, J. M. and Souilah, A. (1992) Near-optimal layout algorithm based on simulated annealing. International Journal of Systems Automation: Research and Applications, 2(3), 227–243.
Psaraftis, H. N. (1980) A dynamic programming solution to the single vehicle many-to-many immediate request dial a ride problem. Transportation Science, 14(2), 130–154.
Putrus, R. S. (1986) Layout design: key to advanced assembly– manufacturing success, in Proceedings of the 4th International Conference on Automated Guided Vehicle Systems, Chicago, IL, pp. 141–154.
Rabeneck, C. W., Usher, J. S. and Evans, G. W. (1989) An analytical model for AGV design, in Proceedings of the 1989 International Industrial Engineering Conference, Toronto, Ontario, Canada, pp. 191–195.
Rembold, B. F. and Tanchoco, J. M. A. (1994a) An integrated framework for the design of material flow systems, in Material Flow Systems in Manufacturing, Tanchoco, J. M. A. (ed.), Chapman & Hall, London, pp. 3–53.
Rembold, B. F. and Tanchoco, J. M. A. (1994b) Evaluating and improving material flow system models. International Journal of Production Research, 32(11), 2585–2602.
Sahni, S. and Gonzalez, T. (1976) P-complete approximation problem. Journal of Association for Computer Machinery, 23(3), 555–565.
Schonberger, R. J. (1984) Just-in-time production systems: replacing complexity with simplicity in manufacturing management. Industrial Engineering, 16(10), 52–63.
Seo, Y. and Egbelu, P. J. (1995) Flexible guide path design for automated guided vehicle systems. International Journal of Production Research, 33(4), 1135–1156.
Sharp, G. P. and Liu, F. F. (1990) An analytical method for configuring fixed-path, closed-loop material handling systems. International Journal of Production Research, 28(4), 757–783.
Sims, E. R. (1991) Planning and Managing Industrial Logistics Systems, Advances in Industrial Engineering, vol. 12, Elsevier.
Singh, N. (1993) Design of cellular manufacturing systems: an invited overview. European Journal of Operational Research, 69(3), 284–291.
Sinriech, D. (1995) Network design models for discrete material flow systems: a literature review. International Journal of Advanced Manufacturing Technology, 10(4), 277–291.
Sinriech, D. and Tanchoco, J. M. A. (1991) Intersection graph method for AGV flow path design. International Journal of Production Research, 24(5), 1725–1732.
Sinriech, D. and Tanchoco, J. M. A. (1992a) An economic model for determining AGV fleet size. International Journal of Production Research, 30(6), 1255–1268.
Sinriech, D. and Tanchoco, J. M. A. (1992b) Impact of unloaded vehicle flow on performance of single loop AGV systems. International Journal of Production Research, 30(10), 2237–2252.
Sinriech, D. and Tanchoco, J. M. A. (1993) Solution methods for the mathematical models of single loop AGV systems. International Journal of Production Research, 31(3), 705–725.
Sinriech, D. and Tanchoco, J. M. A. (1995) An introduction to the segmented flow approach for discrete material flow systems. International Journal of Production Research, 33(12), 3381–3410.
Sly, D. (1996) Using CAD for space planning and asset management. IIE Solutions, 28(5), 36–45.
Sly, D. P., Grajo, E. and Montreuil, B. (1996) Layout design and analysis software. IIE Solutions, 28(7), 18–25.
Stecke, K. E. (1985) Design, planning, scheduling and control problems of flexible manufacturing systems. Annals of Operations Research, 3, 3–12.
Sule, D. R. (1988) Manufacturing Facilities: Location, Planning and Design, PWS–KENT Publishing Company, Boston, MA.
Tanchoco, J. M. A., Egbelu, P. J. and Taghaboni, F. (1987) Determination of the total number of vehicles in an AGV-based material transport system. Material Flow, 4, 33–51.
Tompkins, J. A. and Reed, R. J. (1976) An applied model for the facilities design problem. International Journal of Production Research, 14(5), 583–595.
Tompkins, J. A. and Reed, R. J. (1978) Computerized facilities design, in Computer Aided Layout – a User's Guide, Tompkins, J. A. and Moore, J. M. (eds), AIIE, Norcross, GA, pp. 15–28.
Tompkins, J. A., White, J. A., Bozer, Y. A., Frazelle, E. H., Tanchoco, J. M. A. and Trevino, J. (1996) Facilities Planning, 2nd edn, John Wiley, New York.
Venkataramanan, M. A. and Wilson, K. A. (1991) A branch-and-bound algorithm for flow–path design of automated guided vehicle systems. Naval Research Logistics, 38, 431–445.
Vosniakos, G. C. and Davies, B. J. (1989) On the path layout and operation of an AGV system serving an FMS. International Journal of Advanced Manufacturing Technology, 4(3), 243–262.
Welgama, P. S. and Gibson, P. R. (1995) Computer-aided facility layout – a status report. International Journal of Advanced Manufacturing Technology, 10(1), 66–77.
White, J. A. and Apple, J. M. Jr (1982) Long-range view, better systems integration needed in designs for material handling. Industrial Engineering, 14(3), 50–58.
Wilhelm, M. R. and Evans, G. W. (1987) State-of-the-art modeling techniques for AGV systems design and operation, in Material Handling Focus '87, Material Handling Research Center, Georgia Institute of Technology, Atlanta, GA 30332.
Wilhelm, M. R. and Ward, T. L. (1987) Solving quadratic assignment problems by 'simulated annealing'. IIE Transactions, 19(2), 107–119.
Wolsey, L. A., (1989) Submodularity and valid inequalities in capacitated fixed charge networks. Operations Research Letters, 8(2), 119–124.
Wu, C. T. and Egbelu, P. J. (1995) Concurrent design of shop layout and material handling, in Progress in Material Han– dling Research, Graves, R. J., McGinnis, L. F., Medeiros, D. J., Ward, R. E. and Wilhelm, M. R. (eds), Braun-Brumfield, Inc., Ann Arbor, MI pp. 147–168.
Wysk, R. A., Egbelu, P. J., Zhou, C. and Ghosh, B. K. (1987) Use of spread sheet analysis for evaluating AGV systems. Material Flow, 4(1), 53–64.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Ioannou, G., Minis, I. A review of current research in manufacturing shop design integration. Journal of Intelligent Manufacturing 9, 57–72 (1998). https://doi.org/10.1023/A:1008899325164
Issue Date:
DOI: https://doi.org/10.1023/A:1008899325164