Skip to main content
Log in

Asymptotic Analysis of a Greedy Heuristic for the Multi-Period Single-Sourcing Problem: The Acyclic Case

  • Published:
Journal of Heuristics Aims and scope Submit manuscript

Abstract

The multi-period single-sourcing problem that we address in this paper can be used as a tactical tool for evaluating logistics network designs in a dynamic environment. In particular, our objective is to find an assignment of customers to facilities, as well as the location, timing and size of production and inventory levels, that minimizes total assignment, production, and inventory costs. We propose a greedy heuristic, and prove that this greedy heuristic is asymptotically optimal in a probabilistic sense for the subclass of problems where the assignment of customers to facilities is allowed to vary over time. In addition, we prove a similar result for the subclass of problems where each customer needs to be assigned to the same facility over the planning horizon, and where the demand for each customer exhibits the same seasonality pattern. We illustrate the behavior of the greedy heuristic, as well as some improvements where the greedy heuristic is used as the starting point of a local interchange procedure, on a set of randomly generated test problems. These results suggest that the greedy heuristic may be asymptotically optimal even for the cases that we were unable to analyze theoretically.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ahuja, R.K.,W. Huang, H.E. Romeijn, and D. Romero Morales. (2002). “A Heuristic Approach to the Multi-Period Single-Sourcing Problem with Production and Inventory Capacities and Perishability Constraints”. Research Report 2002-2, Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida.

    Google Scholar 

  • Benders, J.F., W.K.M. Keulemans, J.A.E.E. van Nunen, and G. Stolk. (1986). “A Decision Support Program for Planning Locations and Allocations with the Aid of Linear Programming.” In C.B. Tilanus, O.B. deGaus, and J.K. Lenstra (eds.), Quantitative Methods in Management: Cases Studies of Failures and Successes, Chichester: John Wiley & Sons. chap. 4, pp. 29–34.

    Google Scholar 

  • Chan, L.M.A., A. Muriel, and D. Simchi-Levi. (1998). “Production/distribution Planning Problems with Piece-Wise Linear and Concave Transportation Costs.” Research Report, Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, Illinois.

    Google Scholar 

  • CPLEX Reference Manual. (2001). ILOG CPLEX 7.5. ILOG S.A., Gentilly.

  • Croxton, K.L., B. Gendron, and T.L. Magnanti. (2003). “Models and Methods for Merge-in-Transit Operations.” Technical ReportCRT2000-30, University of Montréal, Montréal, Canada, 2000. Forthcoming in Transportation Science 37, 1-22.

    Google Scholar 

  • Duran, F. (1987). “A Large Mixed Integer Production and Distribution Program.” European Journal of Operational Research 28, 207–217.

    Google Scholar 

  • Dyer, M. and A. Frieze. (1992). “Probabilistic Analysis of the Generalised Assignment Problem.” Mathematical Programming 55, 169–181.

    Google Scholar 

  • Fleischmann, B. (1993). “Designing Distribution Systems with Transport Economies of Scale.” European Journal of Operational Research 70, 31–42.

    Google Scholar 

  • Geoffrion, A.M. and G.W. Graves. (1974). “Multicommodity Distribution System Design by Benders Decomposition.” Management Science 20(5), 822–844.

    Google Scholar 

  • Hinojosa, Y., J. Puerto, and F.R. Fernández. (2000). “A Multiperiod Two-echelon Multicommodity Capacitated Plant Location Problem.” European Journal of Operational Research 123, 271–291.

    Google Scholar 

  • Klose, A. (1999). “An LP-Based Heuristic for Two-Stage Capacitated Facility Location Problems.”Journal of the Operational Research Society 50, 157–166.

    Google Scholar 

  • Martello, S. and P. Toth. (1981). “An Algorithm for the Generalized Assignment Problem.” In J.P. Brans (eds.), Operational Research '81, pp. 589–603. IFORS, North-Holland, Amsterdam.

    Google Scholar 

  • Martello, S. and P. Toth. (1990). “Knapsack Problems, Algorithms and Computer Implementations.” New York: John Wiley & Sons.

    Google Scholar 

  • Romeijn, H.E. and N. Piersma. (2000). “A Probabilistic Feasibility and Value Analysis of the Generalized Assignment Problem.” Journal of Combinatorial Optimization 4(3), 325–355.

    Google Scholar 

  • Romeijn, H.E. and D. Romero Morales. (2000). “A Class of Greedy Algorithms for the Generalized Assignment Problem.” Discrete Applied Mathematics 103, 209–235.

    Google Scholar 

  • Romeijn, H.E. and D. Romero Morales. (2001a). “Generating Experimental Data for the Generalized Assignment Problem.” Operations Research 49(6), 866–878.

    Google Scholar 

  • Romeijn, H.E. and D. Romero Morales. (2001b). “A Probabilistic Analysis of the Multi-Period Single-Sourcing Problem.” Discrete Applied Mathematics 112, 301–328.

    Google Scholar 

  • Romeijn, H.E. and D. Romero Morales. (2002). “Asymptotic Analysis of a Greedy Heuristic for the Multi-Period Single-Sourcing Problem: The Acyclic Case.” Research Report 2002-8, Department of Industrial and Systems Engineering, University of Florida.

  • Romeijn, H.E. and D. Romero Morales. (2002). “A Greedy Heuristic for a Three-level Multi-Period Single-Sourcing Problem.” In A. Klose, M.G. Speranza, and L.N. Van Wassenhove (eds.), Quantitative Approaches to Distribution Logistics and Supply Chain Management, Berlin, Germany: Springer-Verlag, pp. 191–214.

    Google Scholar 

  • Romeijn, H.E. and D. Romero Morales. (2003). “An Asymptotically Optimal Greedy Heuristic for the Multi-Period Single-Sourcing Problem: The Cyclic Case.” Naval Research Logistics 50(5), 412–437.

    Google Scholar 

  • Romero Morales, D. (2000). Optimization Problems in Supply Chain Management. PhD thesis, TRAIL Thesis Series nr. 2000/4 & ERIM PhD series Research in Management nr. 3, The Netherlands.

  • Romero Morales, D., J.A.E.E. van Nunen, and H.E. Romeijn. (1999). “Logistics Network Design Evaluation in a Dynamic Environment.” In M.G. Speranza and P. Stähly (eds.) New trends in distribution logistics, Lecture notes in economics and mathematical systems 480, pp. 113–135. Berlin: Springer-Verlag.

    Google Scholar 

  • Wu, S.D. and H. Golbasi. (2002). “Manufacturing Planning Over Alternative Facilities: Modeling, Analysis and Algorithms.” In J. Geunes, P.M. Pardalos, and H.E. Romeijn (eds.) Supply Chain Management: Models, Applications, and Research Directions, Dordrecht, The Netherlands: Kluwer Academic Publishers. chap. 11, pp. 279–316.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Romeijn, H.E., Morales, D.R. Asymptotic Analysis of a Greedy Heuristic for the Multi-Period Single-Sourcing Problem: The Acyclic Case. Journal of Heuristics 10, 5–35 (2004). https://doi.org/10.1023/B:HEUR.0000019984.80186.48

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/B:HEUR.0000019984.80186.48

Navigation