skip to main content
10.1145/324898.324976acmconferencesArticle/Chapter ViewAbstractPublication PageswscConference Proceedingsconference-collections
Article
Free Access

Travel-time simulation to locate and staff temporary facilities under changing construction demand

Authors Info & Claims
Published:01 December 1999Publication History
First page image

References

  1. AbouRizk, S. and K. Mather 1998. A CAD-Based Simulation Tool for Earthmoving Construction Method Selection. ASCE, Proc. Computing in Civil Engrg. 39-52.Google ScholarGoogle Scholar
  2. Cheng, M.Y. and J.T. O'Connor. 1996. ArcSite: Enhanced GIS for Construction Site Layout. J. of Constr. Engrg. and Mgmt., ASCE, 122:4, 329-336.Google ScholarGoogle Scholar
  3. Francis, R.L., L.F. McGinnis Jr., and J.A. White. 1992. Facility Layout and Location: An Analytical Approach. Prentice-Hall, Englewood Cliffs, New Jersey, 589 pp.Google ScholarGoogle Scholar
  4. Ioannou, P.G. and J.C. Martinez. 1996. Scaleable Simulation Models for Construction Operations. In 1996 Winter Simulation Conference Proceedings. Institute of Electrical and Electronics Engineers, Piscataway, New Jersey, 1329-1336. Google ScholarGoogle ScholarDigital LibraryDigital Library
  5. Martinez, J.C. 1996. STROBOSCOPE State and Resource Based Simulation of Construction Processes. Ph.D. Dissertation, Civil & Envir. Engrg. Dept., Univ. of Michigan, Ann Arbor, Michigan, 518 pp., available at http://www.strobos.ce.vt.edu/.Google ScholarGoogle Scholar
  6. Odeh, A.M. 1992. CIPROS: Knowledge-based Construction Integrated Project and Process Planning Simulation System. Ph.D. Dissertation, Civil and Envir. Engrg. Dept., University of Michigan, Ann Arbor, Michigan. Google ScholarGoogle ScholarDigital LibraryDigital Library
  7. Stone&Webster 1979. Construction Field Manual Construction Facilities Guidelines, Volume I. Construction Department, CFG 2.2, Rev. 0, 8 pages, Stone&Webster Engineering Corporation, Boston, Mass., 23 March 1979.Google ScholarGoogle Scholar
  8. Tommelein, I.D. 1989. SightPlanAn Expert System that Models and Augments Human Decision-Making for Designing Construction Site Layouts. Ph.D. Dissertation, Department of Civil Engineering, Stanford University, Stanford, CA, August; hard copy available from University Microfilms. Google ScholarGoogle ScholarDigital LibraryDigital Library
  9. Tommelein, I.D. 1998. Pull-driven Scheduling for Pipe- Spool Installation: Simulation of Lean Construction Technique. ASCE, J. of Constr. Engrg. and Mgmt. 124:4, 279-288.Google ScholarGoogle ScholarCross RefCross Ref
  10. Tommelein, I.D., R.E. Levitt, and B. Hayes-Roth. 1992a. Site Layout Modeling: How Can Artificial Intelligence Help? ASCE, J. of Constr. Engrg. and Mgmt. 118:3, 594-611.Google ScholarGoogle ScholarCross RefCross Ref
  11. Tommelein, I.D., R.E. Levitt, and B. Hayes-Roth. 1992b. SightPlan Model for Site Layout. ASCE, J. of Constr. Engrg. and Mgmt. 118:4, 749-766.Google ScholarGoogle ScholarCross RefCross Ref
  12. Tommelein, I.D., D. Riley, and G.A. Howell 1998. Parade Game: Impact of Work Flow Variability on Succeeding Trade Performance. Proc. Sixth Annual Conf. International Group for Lean Construction, IGLC-6, 13-15 August held in Guaruja, Brazil, 14 pp.Google ScholarGoogle Scholar
  13. Yeh, I.C. 1995. Construction-Site Layout Using Annealed Neural Network. J. of Comp. in Civil Engrg., ASCE, 9:3, 201-208.Google ScholarGoogle Scholar

Index Terms

  1. Travel-time simulation to locate and staff temporary facilities under changing construction demand

        Recommendations

        Comments

        Login options

        Check if you have access through your login credentials or your institution to get full access on this article.

        Sign in
        • Published in

          cover image ACM Conferences
          WSC '99: Proceedings of the 31st conference on Winter simulation: Simulation---a bridge to the future - Volume 2
          December 1999
          1754 pages
          ISBN:0780357809
          DOI:10.1145/324898

          Copyright © 1999 ACM

          Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

          Publisher

          Association for Computing Machinery

          New York, NY, United States

          Publication History

          • Published: 1 December 1999

          Permissions

          Request permissions about this article.

          Request Permissions

          Check for updates

          Qualifiers

          • Article

          Acceptance Rates

          Overall Acceptance Rate3,413of5,075submissions,67%

        PDF Format

        View or Download as a PDF file.

        PDF

        eReader

        View online with eReader.

        eReader