ABSTRACT
The reliability of equipment is one of the important factors to ensure the production process. In flexible production line, the reliability of equipment will decrease with the use of time. In order to ensure the continuous availability of equipment, multiple equipment maintenance methods are introduced. Firstly, this paper establishes a scheduling model for scientific problems, introducing objective function, constraints and solving algorithm. Finally, the effectiveness of the method is proved by case study.
- BRUKER P, SCHLIC R. Job Shop Scheduling with Multipurpose Machines[J]. Computing, 1990, 4(2):369--375.Google Scholar
- BRANDIMARTEP. Routing and scheduling in a flexible job shop by taboo search[J], Annals of Operations Research, 1993, 22(2), 157--183Google ScholarCross Ref
- Ouelhadj D, Petrovic S. A survey of dynamic scheduling in manufacturing systems[J]. Journal of Scheduling, 2009, 12(4): 417--418.Google ScholarDigital Library
- Yoon J S, Shin S J, Suh S H. A conceptual framework for the ubiquitous factory[J]. International Journal of Production Research, 2012, 50(8): 2174--2175.Google ScholarCross Ref
- Luo H, Fang J, Huang G Q. Real-time scheduling for hybrid flowshop in ubiquitous manufacturing environment[J]. Computers & Industrial Engineering, 2014, 84(C): 12--23.Google ScholarDigital Library
- Zhong R Y, Huang G Q, Lan S, et al. A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing [J]. Advanced Engineering Informatics, 2015, 29(4):799--812.Google ScholarDigital Library
Index Terms
- Research on Flexible Production Line Scheduling Considering Multiple Maintenance Mechanisms
Recommendations
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
Research highlights Integrated flexible job-shop and preventive maintenance is probed in this study. Makespan as an objective for production part and reliability as an objective for maintenance part are optimized simultaneously. A mathematic model and a ...
Multi-objective modeling for preventive maintenance scheduling in a multiple production line
The change of market and the explosion of product variety have led to increased automation and the need for complex equipment. Therefore, the reliability and the maintainability of the equipment play an important role in controlling both the quantity ...
Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling
This paper presents an algorithm based on Ant Colony Optimization paradigm to solve the joint production and maintenance scheduling problem. This approach is developed to deal with the model previously proposed in [3] for the parallel machine case. This ...
Comments