skip to main content
10.1145/3495018.3495307acmotherconferencesArticle/Chapter ViewAbstractPublication PagesaiamConference Proceedingsconference-collections
research-article

Bridge Integrated Early Warning System Based on BIM Secondary Development

Published: 14 March 2022 Publication History

Abstract

It has become an industry consensus to actively promote the research and application of BIM technology in the field of bridge engineering. This paper mainly studies the bridge comprehensive early warning system based on BIM secondary development. This paper builds a bridge safety risk early warning model based on credibility measure and develops a BIM-based bridge safety risk early warning subsystem. Firstly, the overall framework of the bridge safety risk early warning subsystem is designed based on the information data transmission mode of the BIM integrated platform. Then, the secondary development is carried out based on the secondary development interface API to achieve the embedding of the security risk early warning model. And the reliability and stability of the subsystem are verified and analyzed in order to realize the automation and visualization of security risk early warning.

References

[1]
Zou Y, Kiviniemi A, Jones S W. Developing a tailored RBS linking to BIM for risk management of bridge projects. Engineering Construction & Architectural Management, 2016, 23(6):727-750.
[2]
Luo Y, Liu Y . BIM for Bridge Design. IABSE Symposium Report, 2016, 106(10):343-350.
[3]
Markus, Nldgen, Andreas, BIM in Bridge Design - 3D-Modeling, Design-Embedded-FE-Simulation and -Drawings, A large scale project in a Port Area. Fortschritt-Berichte VDI-Zeitschriften, Reihe 4. Bauingenieurwesen, 2017(TN.223):67-78.
[4]
Akinade O O, Oyedele L O, Ajayi S O, Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment. Journal of Cleaner Production, 2018, 180(APR.10):375-385.
[5]
Li X, Xu J, Zhang Q. Research on Construction Schedule Management Based on BIM Technology. Procedia Engineering, 2017, 174(Complete):657-667.
[6]
Shin T S. Building information modeling (BIM) collaboration from the structural engineering perspective. International Journal of Steel Structures, 2017, 17(1):205-214.
[7]
Ribeiro G, Cherobim A . Environment and innovation: discrepancy between theory and research practice. Rai Revista De Administrao E Inovao, 2017, 14(1):30-40.
[8]
Garrabou X, Wicky B, D Hilvert. Fast Knoevenagel Condensations Catalyzed by an Artificial Schiff-Base-Forming Enzyme. Journal of the American Chemical Society, 2016, 138(22):6972-6974.
[9]
Ivanov A I, Ivanova Z A, Sokolov I V. Secondary Development of Unused Land. Russian Agricultural Sciences, 2020, 46(3):274-278.
[10]
Lee J D, Friedmann P D, Kinlock T W, Extended-Release Naltrexone to Prevent Opioid Relapse in Criminal Justice Offenders. N Engl J Med, 2016, 374(13):1232-1242.
[11]
Mackiewiczlyziak J, P Mihályi. Central Bank Credibility: Determinants and Measurement. A Cross-Country Study. yziak, 2016, 11(2):88-9.
[12]
Eek M, Hallqvist R, Gavel H, A Concept for Credibility Assessment of Aircraft System Simulators. Journal of Aerospace Computing Information & Communication, 2016, 54(6):1-15.

Cited By

View all
  • (2024)Develop a New Revit Plug-in Enabling Building Components-Based Construction and Renovation Waste Quantification: An Australia StudyCircular Economy for Buildings and Infrastructure10.1007/978-3-031-56241-9_21(333-341)Online publication date: 4-May-2024

Recommendations

Comments

Information & Contributors

Information

Published In

cover image ACM Other conferences
AIAM2021: 2021 3rd International Conference on Artificial Intelligence and Advanced Manufacture
October 2021
3136 pages
ISBN:9781450385046
DOI:10.1145/3495018
Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

Publisher

Association for Computing Machinery

New York, NY, United States

Publication History

Published: 14 March 2022

Permissions

Request permissions for this article.

Check for updates

Qualifiers

  • Research-article
  • Research
  • Refereed limited

Conference

AIAM2021

Acceptance Rates

Overall Acceptance Rate 100 of 285 submissions, 35%

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)3
  • Downloads (Last 6 weeks)0
Reflects downloads up to 17 Feb 2025

Other Metrics

Citations

Cited By

View all
  • (2024)Develop a New Revit Plug-in Enabling Building Components-Based Construction and Renovation Waste Quantification: An Australia StudyCircular Economy for Buildings and Infrastructure10.1007/978-3-031-56241-9_21(333-341)Online publication date: 4-May-2024

View Options

Login options

View options

PDF

View or Download as a PDF file.

PDF

eReader

View online with eReader.

eReader

HTML Format

View this article in HTML Format.

HTML Format

Figures

Tables

Media

Share

Share

Share this Publication link

Share on social media