Contract Performance Monitoring Method Based on Earned Value Management and Performance Threshold Model

Published: 18 July 2022 Publication History

Abstract

In order to solve the problem that managers cannot accurately and comprehensively understand the situation and make timely adjustments in the process of contract performance supervision, a calculation method of real-time utility of the project based on the earned value management theory in project management is proposed. This method uses the Hall three-dimensional structure model combined with the evaluation index to realize real-time monitoring of contract performance. Furthermore, a threshold model of cost, schedule, and quality performance is proposed to analyze the deviation between the actual situation and the ideal state, and finally the feasibility and effectiveness of the method are illustrated by a practical example. This article improves the evaluation and analysis methods of contract performance monitoring, which can provide theoretical basis and practical reference for contract performance monitoring and management personnel.

References

[1]
Cai W Q, Huang D, Guo H. Comprehensive evaluation method of equipment procurement contract performance supervision[J]. Journal of Academy of Armored Force Engineering, 2018,32(04):16-19.
[2]
Zhang S X. Research on Cost - Schedule - Quality Integrated Evaluation of Engineering Project Based on Vector Angle Cosine[D]. Qingdao University of Technology,2016.
[3]
Wu S H, Liu X D, He B. Threshold Analysis Method for Earned Value Management Performance Index of Equipment Development Project[J]. Journal of Ordnance Equipment Engineering,2017,38(12):135-141+154.
[4]
Ma X P, Gao K, Yao B. Application of Multilevel Earned Value Method in Shipyard Operation Schedule Control[J]. Ship Engineering,2019,41(09):21-25.
[5]
Fleming Q. Zhang B, Chen J. Earned value project management[M].Publishing House Of Electronics Industry,2007,07:90.
[6]
Sun J R. Study on Risk Pre - control of Construction Contract of Construction Unit[J]. Construction Economy,2021,42(S1):244-248.
[7]
Walt Lipke, Ofer Zwikael,Kym Henderson etc.Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes[J].International Journal of Project Management. May 2009,5(27):400-407
[8]
Wang M, Yin C X, Cheng J L. Application of Analytic Hierarchy Process - Fuzzy Comprehensive Evaluation Method in Assessment of Water Pollution Control Technology in Pulp and Paper Industry[J]. Journal of Forestry Engineering, 2021,6(04):107-113.
[9]
Chen W G, Zhang S X, Wang H H. Project Cost / Schedule / Quality Integrated Evaluation Based on Vector Angle Cosine[J]. Journal of Civil Engineering and Management,2016,33(02):18-21+42.
[10]
L.P. Kerkhove, M. Vanhoucke. Extensions of earned value management: Using the earned incentive metric to improve signal quality[J]. International Journal of Project Management,2017,35(2).
[11]
Song Y S, Liu R J. Influence of Knowledge Threshold on Organizational Learning Performance[J]. Journal of Management Science,2016,29(04):94-103.
[12]
Zhang J G, Ji F. Research on Critical Chain Project Buffer Management Method Based on Activity Elasticity[J]. Chinese Journal of Management,2020,17(06):924-930.
[13]
Mou Q, Jia G S. Improving Completion Cost Estimation of Large and Medium-sized Projects with Fixed Period[J]. Chinese Journal of Management Science,2018,26(04):180-187.

Recommendations

Comments

Information & Contributors

Information

Published In

cover image ACM Other conferences
MSIE '22: Proceedings of the 4th International Conference on Management Science and Industrial Engineering
April 2022
497 pages
ISBN:9781450395816
DOI:10.1145/3535782
Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

Publisher

Association for Computing Machinery

New York, NY, United States

Publication History

Published: 18 July 2022

Permissions

Request permissions for this article.

Check for updates

Qualifiers

  • Research-article
  • Research
  • Refereed limited

Funding Sources

Conference

MSIE 2022

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • 0
    Total Citations
  • 29
    Total Downloads
  • Downloads (Last 12 months)7
  • Downloads (Last 6 weeks)0
Reflects downloads up to 16 Feb 2025

Other Metrics

Citations

View Options

Login options

View options

PDF

View or Download as a PDF file.

PDF

eReader

View online with eReader.

eReader

HTML Format

View this article in HTML Format.

HTML Format

Figures

Tables

Media

Share

Share

Share this Publication link

Share on social media