ABSTRACT
Reasonable ordering and transshipment solutions can minimize the total cost of the enterprise, this paper establishes a model to provide solutions for the maximization of future operational benefits of production-oriented enterprises. First, establish the supplier evaluation model of TOPSIS pros and cons distance method, and screen out the most important suppliers. Then, the two-stage linear programming model is used to find the most economical purchase method that takes into account the production requirements in the next 24 weeks, and the 0-1 integer programming is used to solve the transshipment plan with the lowest loss rate. Finally, on this basis, the constraints of the original linear programming are considered to be strengthened, and the potential coefficient is calculated to obtain the increase in the production capacity of the enterprise. After the improvement, a new optimal solution and transfer plan are given.
- He Zhaohui. Research on the Optimization of Supplier Evaluation System of F Company [D]. University of Electronic Science and Technology of China, 2020.Google Scholar
- Si Shoukui, Sun Zhaoliang. Mathematical Modeling Algorithms and Applications [M]. 2nd Edition. Beijing: National Defense Industry Press, 2016.Google Scholar
- 0-1 Integer Programming Model and Algorithm for Traveling Salesman Problem Matlab Optimization Toolbox User's Guide. R2014b.Google Scholar
- He Jianyong edited. The foundation of operations research [M]. Beijing: Tsinghua University Press, 2000: 477.Google Scholar
- Chen Haihong. Convergent Fourier Analysis of One-Dimensional Unsteady Heat Conduction Problems [J]. Henan Science, 2016,34(2): P187-194.Google Scholar
- Research on the Optimization Scheme of Enterprise Raw Material Ordering and Transshipment based on TOPSIS Method
Recommendations
Economic Lot Scheduling Problem with Raw Material Considerations
We extend the traditional model of the economic lot scheduling problem by considering various issues associated with the management of the raw materials for production. Several items are produced on a single machine at finite production rates with setup ...
Simulation based optimization of multi-location transshipment problem with capacitated transportation
WSC '08: Proceedings of the 40th Conference on Winter SimulationIn this study, a single-item two-echelon inventory system where the items can be stored in each of N stocking locations is optimized using simulation. The aim of this study is to minimize the total inventory, backorder, and transshipments costs, based ...
Research on Level of Repair Optimization Method Based on Comprehensive Cost Analysis
CSAE '18: Proceedings of the 2nd International Conference on Computer Science and Application EngineeringThe1 reasonable level of repair analysis (LORA) can improve the availability and maintenance efficiency of the equipment and reduce the maintenance cost of the equipment. The traditional level of repair quantitative analysis method only considered the ...
Comments