ABSTRACT
To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a "Three-elements and double confirmation" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.
- Jang Zhenhua. 2014. Cause Analysis and Countermeasure of Electric Locomotive Entering the Area Without Electric Power (Network)[J]. Shanghai Railway Science and Technology, 2014(04): 54-55.Google Scholar
- Huang Changkui. 2013. Countermeasures to Prevent Electric Locomotives from Entering the Outage (No Grid) Area[J]. Railway Transport and Economy, 35(03): 85-88.Google Scholar
- Fukuda H. 2002. A Study on Incident Analysis Method for Railway Safety Management[J]. Quarterly Report of RTRI, 43(2): 83-86.Google ScholarCross Ref
- Sang-Ahm, Kim. 2013. Development of Risk-based Railway Safety Management System [J]. International Journal of Advanced Railway, 1(2): 35-40.Google Scholar
- Xu Yan, Yu Qiang, Huang Hong, 2021. A Method and System for Locomotive Selective Row Approach of Electric Locomotive to Prevent Breaking into Area Without Electric Power: China, 202110749873.2 [P].2021.08.17 [2022.2.21].Google Scholar
- Kong Xiangfang, Hu Sentang, Liu Xiaobo, Kuang Liping. 2021. Discussion on the Safety Management Strategy of railway Car Service System Based on Risk Warning [J]. Transportation Enterprise Management, 36(04): 99-101.Google Scholar
- Gong Guangquan. 2010. Research on the Ground Equipment of the Simulation System of Shunting[D]. Southwest Jiaotong University.Google Scholar
- Ren Xiaoxian, Chen Jie, Li Chenyang, Yang Yixian. 2018. Vulnerability Correlation Hazard Assessment of Internet of Things System Based on Risk Matrix[J]. Network and Information Security, 2018(11): 81-88.Google Scholar
Index Terms
- Research on Integrated Automatic Control System for Railway Station Receiving and Dispatching Line Confirmation
Recommendations
An agent-based support system for railway station dispatching
A D-Agent support system is modular designed for railway station dispatching.The D-Agent can behave as a dispatcher by embedding expert dispatching knowledge.MIPL formulations are integrated to optimize the railway traffic control.The D-Agent can keep ...
Integrated Communication Technology for Supervisory Control and Data Acquisition System of PV Power Station
ISDEA '12: Proceedings of the 2012 Second International Conference on Intelligent System Design and Engineering ApplicationLarge-scale grid-connected PV power station and customer-premise grid-connected PV power station are currently the main types of PV power station in China. Because of various scale of construction, operation environments, installation locations and ...
Research on Optimization Model and Algorithm of Railway Wagon Flow Routing
APCIM & ICTTE 2018: Proceedings of the Asia-Pacific Conference on Intelligent Medical 2018 & International Conference on Transportation and Traffic Engineering 2018The choice of wagon flow routing is the basis of railway transportation, which can directly affect the transportation cost of railway. In recent years, China's high-speed railway lines have been opened in large numbers, but the freight volume fluctuated ...