ABSTRACT
With the reform of China's power system, power has become a pillar industry of China's national economy, which needs to improve the competitiveness of the power industry. However, in the actual power engineering, the cost management of power transmission and transformation project (hereinafter referred to as PTATP) runs through the whole process of project construction, involving the processes of feasibility study, design, construction, change, completion and final accounts, which is a systematic problem. With the application of intelligent technology, collaborative office, BIM, smart site and big data have been applied to project management and cost management, which has been fully introduced into the digital and intelligent era. Therefore, the construction of PTATP cost management system has become the trend in the future. Through the cost management system of PTATP, we can collect, store, calculate and optimize the cost of PTATP life cycle, which can predict and warn the project cost. Therefore, this paper first analyses the application technology and construction principles of the cost management system for power transmission and transformation projects, as well as the main problems existing in the current cost management model. Then, some prediction methods, standardised data elements, validation data and integration data are analysed for the retrieved key cost data to realise the management of key cost data before the cost data collection template for transmission and substation projects, and effectively improve the key cost data matching ratio in the data collection template. Finally, this paper constructs and analyses the intelligent research results of the system, and introduces how to build a professional intelligent application platform for cost management in terms of platform architecture, technical route selection, application architecture design and data integration design. It is hoped to provide a more systematic and professional solution for the pricing management of power transmission and transformation projects.
- Liu Hongzhi. Research on promotion strategy of BIM Technology in CM of PTATP. Construction economy, 2016, 37 (09): 63-68.Google Scholar
- Sun Guowang. Application of BIM Technology in CM of PTATP. Intelligent City, 2020, 6 (10): 88-89.Google Scholar
- Liu Biao. Application of data mining technology in CM of PTATP. Management and science and technology of small and medium-sized enterprises (next Xunyuan), 2020 (11): 153-154.Google Scholar
- You Zhenjiang. Research on CM of PTATP. Electromechanical information, 2012 (06): 176-177.Google Scholar
- Niu Dongxiao. Application of data mining technology in CM of PTATP. East China electric power, 2012, 40 (04): 540-543.Google Scholar
- Zhang Hongyun. Research on development trend and optimization of CM of PTATP. East China power, 2012, 40 (04): 544-547.Google Scholar
- Pan Jingting. Measures to strengthen CM of PTATP. Science and technology and enterprises, 2012 (20): 69.Google Scholar
- Lu Yanchao. Comparative study on CM modes of PTATP at home and abroad. Engineering economics, 2017, 27 (04): 5-7.Google Scholar
- Huang Xiaoju, Xu Bin. Reflections on CM of PTATP in Power Enterprises. Modern industrial economy and informatization, 2017, 7 (07): 28-29.Google Scholar
- Guo siliang. Research and application of BIM Technology in CM of PTATP. Smart city, 2017, 3 (10): 164.Google Scholar
- Ye Boying. Application of project management theory in CM of PTATP. Today Keyuan, 2007 (18): 123.Google Scholar
- Xu Dan. Research on key links of CM of UHV PTATP based on multi-attribute trade-off. China market, 2019 (23): 110-112.Google Scholar
- Li Li. Key node management audit innovation based on power grid transmission and transformation project. China internal audit, 2020 (11): 13-17.Google Scholar
- Qiao Tingting, Wang Xiaodong. Cost management problems and strategy analysis of PTATP from the perspective of the whole process. Enterprise technology development, 2012, 31 (35): 91-92.Google Scholar
- Xiong Zhihao. Brief discussion on the implementation of automation system for budgeting of electrical installation. Modern economic information, 2009 (18): 289 + 291.Google Scholar
Index Terms
- Research on Intellectualization of Cost Management System of Power Transmission and Transformation Project
Recommendations
Analysis and Prediction of Differential Operation and Maintenance Cost of Power Transmission and Transformation
AbstractThe operation and maintenance expenses of power transmission and transformation projects, as a significant power supply carrier of the nation, continue to rise as a result of the sustained and quick expansion of China's social economy and the ...
Cost management system of electric power engineering project based on project management theory
Artificial Intelligent Techniques and its ApplicationsWith the increase of labor cost, material cost and equipment cost in the electric power project, the traditional cost management can’t meet the needs of the people. The new project cost management system has always been the research hotspot of the ...
Organization Cost, Sales, General and Administrative Expenses and Management Cost
ICIII '09: Proceedings of the 2009 International Conference on Information Management, Innovation Management and Industrial Engineering - Volume 01According to Coase theory, there exists a cost of allocating resources by administrative power, that is, organization cost. Based on the comparison of organization cost with transaction cost, Coase revealed why firms exist and also illustrated the ...
Comments