ABSTRACT
The research proposal analyzed different structural, road and sanitary construction projects, using existing files, with which the time prediction method with equations of motion was evaluated to analyze its application to construction projects in Peru. Projects with delays were chosen and their prediction efficiency was evaluated. The evaluation was carried out through a velocity and acceleration analysis, considering the project life cycle in four stages. The velocity, acceleration, average velocity and position of each stage were calculated using mathematical equations. The final result was an efficiency index of the prediction method. The proposed research offers a degree of efficiency, in the alternative of a prediction method for Peruvian construction projects, saving time and resources with an easy application, to infrastructure projects, roads and sanitation, in turn it can be applied in different places with similar characteristics.
- S. Karki y B. Hadikusumo, «Machine learning for the identification of competent project managers for construction projects in Nepal», Construction Innovation, vol. 23, n.o 1, pp. 1-18, 2023, doi: 10.1108/CI-08-2020-0139.Google ScholarCross Ref
- L. Chen, Q. Lu, y D. Han, «A Bayesian-driven Monte Carlo approach for managing construction schedule risks of infrastructures under uncertainty», Expert Systems with Applications, vol. 212, 2023, doi: 10.1016/j.eswa.2022.118810.Google ScholarDigital Library
- A. Celoza, D. P. De Oliveira, y F. Leite, «Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects», Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 15, n.o 2, 2023, doi: 10.1061/JLADAH.LADR-916.Google ScholarCross Ref
- A. E. Muller , «The effect of machine learning tools for evidence synthesis on resource use and time-to-completion: protocol for a retrospective pilot study», Systematic Reviews, vol. 12, n.o 1, 2023, doi: 10.1186/s13643-023-02171-y.Google ScholarCross Ref
- Z. T. Kosztyán, G. Novák, R. Jakab, I. Szalkai, y C. Hegedűs, «A matrix-based flexible project-planning library and indicators», Expert Systems with Applications, vol. 216, 2023, doi: 10.1016/j.eswa.2022.119472.Google ScholarDigital Library
- J. Babí Almenar, C. Petucco, G. Sonnemann, D. Geneletti, T. Elliot, y B. Rugani, «Modelling the net environmental and economic impacts of urban nature-based solutions by combining ecosystem services, system dynamics and life cycle thinking: An application to urban forests», Ecosystem Services, vol. 60, 2023, doi: 10.1016/j.ecoser.2022.101506.Google ScholarCross Ref
- D. Murguia, C. Vasquez, P. Demian, y R. Soetanto, «BIM Adoption among Contractors: A Longitudinal Study in Peru», Journal of Construction Engineering and Management, vol. 149, n.o 1, 2023, doi: 10.1061/(ASCE)CO.1943-7862.0002424.Google ScholarCross Ref
- C. Huaman-Orosco, A. A. Erazo-Rondinel, y R. F. Herrera, «Barriers to Adopting Lean Construction in Small and Medium-Sized Enterprises—The Case of Peru», Buildings, vol. 12, n.o 10, 2022, doi: 10.3390/buildings12101637.Google ScholarCross Ref
- S. Kermanshachi y A. Pamidimukkala, «Robustness Analysis of Total Project Cost and Schedule Delay and Overrun Indicators of Heavy Industrial Projects», Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 15, n.o 2, 2023, doi: 10.1061/JLADAH.LADR-942.Google ScholarCross Ref
- G. Castelblanco, J. Guevara, D. Rojas, J. Correa, y K. Verhoest, «Environmental Impact Assessment Effectiveness in Public-Private Partnerships: Study on the Colombian Toll Road Program», Journal of Management in Engineering, vol. 39, n.o 2, 2023, doi: 10.1061/JMENEA.MEENG-5015.Google ScholarCross Ref
- M. Bagherpour, H. Mardimamaqani, A. Fallahdizcheh, y H. Steyn, «Project scheduling and forecasting by laws of physical movement», 10.5267/j.jpm, pp. 97-108, 2019, doi: 10.5267/j.jpm.2019.1.001.Google ScholarCross Ref
- F. Poulsen, T. Hansen, y M. G. Reuter, «Predicting slow relaxation timescales in open quantum systems», Journal of MathematicalGoogle Scholar
- Chemistry, vol. 60, n.o 8, pp. 1542-1554, 2022, doi: 10.1007/s10910-022-01367-2.Google ScholarCross Ref
- D. R. C. Guerreros, S. G. C. Quispe, P. C. G. Abregu, M. M. H. Mohamed, y S. A. C. Quijano, «Design of an Automatic Landslide and Earthquake Warning System in Rural Areas of Peru», presentado en 2022 IEEE 13th Annual Ubiquitous Computing, Electronics and Mobile Communication Conference, UEMCON 2022, 2022, pp. 303-307. doi: 10.1109/UEMCON54665.2022.9965639.Google ScholarCross Ref
- F. Biondini y D. M. Frangopol, «Life-Cycle Performance of Civil Structure and Infrastructure Systems: Survey», Journal of Structural Engineering (United States), vol. 144, n.o 1, 2018, doi: 10.1061/(ASCE)ST.1943-541X.0001923.Google ScholarCross Ref
Index Terms
- Evaluation of the functionality of the laws of motion in predicting the completion of Peruvian construction projects
Comments