- N. Rand, Rand Information Systems, Private Communication, August, 1980.Google Scholar
- Conversion Special Report: Changing to New Technology, Rand Information Systems, National Symposium on Computer System Enhancement, Washington, D.C., Nov. 1979.Google Scholar
- J. R. Wolberg, Prediction Analysis, Van Nostrand, 1967.Google Scholar
- J. R. Wolberg and M. Rafal, The development and use of automatic converters for software conversions, Proceedings of the ONLINE Symposium on Pragmatic Programming and Sensible Software, 77--92, 1978.Google Scholar
- F. P. Brooks, The Mythical Man Month, Addision-Wesley, 1975. Google ScholarDigital Library
- C. E. Walston and C. P. Felix, A method of programming measurement and estimation, IBM Systems J., Vol. 16, #1, 1977.Google ScholarDigital Library
- V. Schneider, Prediction of Software Effort and Project Duration - Four New Formulas, SIGPLAN Notices, Vol. 13, No. 6, 49--59, 1978. Google ScholarDigital Library
Recommendations
Self-Reconfigurable Embedded Systems on Low-Cost FPGAs
Hardware acceleration significantly increases the performance of embedded systems built on programmable logic. Allowing a FPGA-based MicroBlaze processor to self-select the coprocessors it uses can help reduce area requirements and increase a system's ...
Minimizing the Total Cost in an Integrated Vendor--Managed Inventory System
In this paper we consider a complex production-distribution system, where a facility produces (or orders from an external supplier) several items which are distributed to a set of retailers by a fleet of vehicles. We consider Vendor-Managed Inventory (...
Inventory model with penalty cost and shortage cost using fuzzy numbers
In this paper, an inventory model with penalty cost and shortage cost is formulated. The aim of this research work is to minimise the time period, total cost and the order quantity. To achieve this, the formulated inventory model is converted to fuzzy ...
Comments